Punch List Template: Free New Home Snagging Checklist

A punch list, or snag list, is the list of defects you check before you accept a new or renovated home. Check every room for walls, paint, floors, doors, windows, electrics and plumbing, mark what needs fixing, add a note and send the list to your builder.

Rooms

  • Living room 1
  • Kitchen 1
  • Bedroom 1
  • Bedroom 2
  • Bedroom 3
  • Bathroom 1
  • Bathroom 2
Add a room:

0 of 70 checked · 0 to fix

Whole house

  • Builder's materials and rubbish removed
  • Home and garden left clean

Living room 1

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works

Kitchen 1

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works
  • Tiles even, grout and sealant complete
  • Sink, taps, shower and toilet fixed and working
  • No leaks; water drains away
  • Extractor fan works
  • Cabinets and worktops level, doors aligned

Bedroom 1

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works

Bedroom 2

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works

Bedroom 3

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works

Bathroom 1

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works
  • Tiles even, grout and sealant complete
  • Sink, taps, shower and toilet fixed and working
  • No leaks; water drains away
  • Extractor fan works

Bathroom 2

  • Walls and ceilings smooth, no cracks
  • Paint even, no marks or drips
  • Floor level, no gaps, chips or squeaks
  • Doors open, close and lock smoothly
  • Windows open, close and seal; glass unscratched
  • Sockets, switches and lights work
  • Heating or air conditioning works
  • Tiles even, grout and sealant complete
  • Sink, taps, shower and toilet fixed and working
  • No leaks; water drains away
  • Extractor fan works

Outside

  • Outside walls and paint finished
  • Fences and gates secure
  • Paths and drive even, no puddles
  • Gutters and drains clear and connected
  • Roof covering complete
  • Roof space or loft insulated and dry

Your list stays on your device or in your own house project. A shared link holds only rooms and statuses, never notes.

Check items based on LABC Warranty: LABC Warranty

How to use the punch list

  1. Set the rooms

    Use the rooms of your plan or add them one by one.

  2. Walk through and mark

    For every line: OK, to fix (with a note) or fixed.

  3. Send and follow up

    Print or share the list with your builder and mark items as they are fixed.

Questions about the punch list

What is a punch list in construction?

The list of defects and unfinished work found when you inspect a new or renovated home before handover. The builder fixes each item before the final payment.

When should I do the snagging inspection?

Before you accept the house and before the last payment, and again before the defects period ends.

What should a snag list include?

Every room: walls, paint, floors, doors, windows, electrics and heating, plus tiles, fixtures and leaks in kitchens and bathrooms; outside: walls, fences, paths, gutters and the roof. This list follows LABC Warranty.

A checklist to help you inspect, not a professional survey.