House Building Checklist: Every Step From Budget to Keys
Building a house goes through four stages: feasibility, design, permits, then construction and handover. This checklist lists every step from the first budget to the keys, with a free tool for each one. Tick steps off: they are saved in your own house project, or on this device.
New build
Feasibility
- House cost estimate: Estimate the construction cost before you commit.
- Plot and zoning rules: Check the setbacks, coverage and floor area your plot allows.
- Choose your team: List the professionals you need and what they charge.
Design
- 2D floor plan: Draw the floor plan room by room.
- 3D model: See the house in 3D from the plan.
- Renders and interior design: Renders and interior design to decide on finishes.
- Drawing set and quantities: Drawing set and bill of quantities for quotes and the permit.
Permits
- Permit documents: Gather the documents the authority asks for.
- Consultant approval rounds: Get the consultants' approvals.
- Permit approved: Receive the building permit.
Build & handover
- Contractor quotes: Compare at least three written quotes.
- Schedule and payment stages: Agree the timeline and the stage payments.
- Snag list: Inspect every room and list defects before handover.
- Move-in checklist: Final payment, documents and keys.
Renovation
Feasibility
- House cost estimate: Estimate the construction cost before you commit.
- Survey the existing home: Measure and document the existing home.
- Choose your team: List the professionals you need and what they charge.
Design
- Plan of the existing home: Draw the plan of the home as it is now.
- Proposed changes: Mark what you remove and what you build.
- Renders and interior design: Renders and interior design to decide on finishes.
Permits
- Check whether you need a permit: Check which works need a permit.
- Permit documents: Gather the documents the authority asks for.
- Permit approved: Receive the building permit.
Build & handover
- Contractor quotes: Compare at least three written quotes.
- Schedule and payment stages: Agree the timeline and the stage payments.
- Snag list: Inspect every room and list defects before handover.
- Move-in checklist: Final payment, documents and keys.
Questions about building a house
What are the steps to build a house?
Feasibility (budget, plot and team), design (floor plan, 3D model, renders and drawings), permits (documents, approvals and the permit) and construction (quotes, schedule and payments, snag list and move-in).
What should I do first when building a house?
Set a realistic budget and check what your plot allows before you hire an architect: both decide the size of the house.
Is the checklist different for a renovation?
Yes. Switch to renovation: it starts with the renovation budget and a survey of the existing home, and checks whether you need a permit.